CAMPOS DEL SOL 378 MW / COPIAPÓ / CHILE

A partir de 50 MW
Owner: ENEL GREEN POWER CHILE
Power: 378 MW
Technology used: Parque Solar fotovoltaico
Start of work: 05/2021
Commercial Commissioning: 03/2022

Description

  • Profile driving
  • Mechanical assembly of trackers
  • Assembly of solar panels
  • Panel connection
  • String box assembly
  • Trench excavation for low and medium voltage cables
  • Laying of medium and low voltage cables
  • Connection of conversion units grounding tests
  • Commissioning and start-up